Alice & Bob Helium 2 ("Galvanic Cat")
Alice & Bob Helium 2 ("Galvanic Cat")
Register profile — the machine's variant of its architecture
qubit type: dissipatively stabilised, galvanically coupled, transmon-free cat qubits at n-bar = 11
gate mechanism: Z gate 94.2% in 26.5 ns; no cat-cat CNOT anywhere
connectivity: 1-D repetition chain
control: room-temperature control
control placement: room-temp
readout: dispersive
gate evidence: no published figure
codes: two-legged-cat
flags: not peer-reviewed, phase-flip time unpublished
Technologies by layer — the machine's cell per layer
| 1 Qubit carrier | Bosonic cavity mode · primary ▨ ✅ 12-cat-qubit chip, galvanically coupled, transmon-free cats at n̄=11; bit-flip >1 h (33–60 min 95% CI), Sep 2025, preliminary |
| 2 Encoding | Cat-code encoding (biased noise) · primary ▨ ✅ two-legged cat at n̄=11: bit-flip >1 h (33–60 min 95% CI); phase-flip time not measured in that run (Sep 2025) |
| 3 Gate mechanism | Ancilla-mediated bosonic gates (cat CX, dual-rail CZ, beamsplitter) · primary ▨ ✅ Z gate 94.2% fidelity in 26.5 ns (Sep 2025); no cat–cat CNOT demonstrated |
| 4 Connectivity / transport | |
| 5 Control | |
| 6 Readout | |
| 7 Code | Bosonic concatenation (repetition-cat, LDPC-cat, GKP+qLDPC) · primary ▨ 🔎 two-legged cat at n̄=11; register also lists squeezed cat (×160 bit-flip lifetime, no phase-flip penalty, Mar 2025); no logical error rate |
| 8 Decoder | |
| 9 Interconnect | |
| 10 Manufacturing | Superconducting-qubit lithography (Al/AlOx/Al junctions, Nb wiring, 300 mm) · primary ◌ 🔎 galvanically coupled transmon-free cat circuits on one planar chip; fab process not published (Boson 3's memory was a quarter-wave coplanar resonator in tantalum on sapphire: Réglade et al., Nature 629, 778, 2024) |
Standard records
1Q gate time → 27 ns · typical (Z gate at 94.2% fidelity)
Sep 2025 · source
bit-flip time (cat qubit, protected axis) → 3600 s · cat bit-flip time at photon number 11 (the protected axis of a cat qubit, not a T1; the top of the quoted interval)
33-60 min, 95% CI, company release; phase-flip time at the same point is not published · Sep 2025 · source
evidence: ✅ 3 / 10